It was time to replace our back deck. It needed repairs. It also was cover for an infestation of chipmunks. Yes, a lot of chipmunks. Last year a friend told me an easy way to get rid of them. 2023 I removed (ok they died) 24 chipmunks. Their kin folk moved in and this last summer 27 were removed. I was done playing around. The deck had to go.
Removed my beautiful hosta first |
Mike found a concrete company that would rip off the old and give us a new cement patio. He was a local, born and raised in Elgin who started out working for his father and Uncle. He could start in 2 weeks.
In the mean time we looked into getting a screen porch. Way too expensive so we got an awning instead. No more sticks, acorns and leaves falling on us.
Time to rip up this deck. The top deck was reinforced for our hot tub so it was stubborn, but these guys worked Hard!
Hauled it all away too |
We were really looking forward to walking out the garage back door to a flat surface. Cement was poured 3 days later.
I got a curved outside edge with a pattern border. It turned out so good, just what I wanted.
I asked them to leave some of the dirt they dug up to level the ground around the patio. I wanted to fill the corner with some hosta plants.
pile didn’t look THAT big |
Mike and I spent 3 weeks off and on taking rocks out of the dirt, spreading the dirt along the side of the house where their equipment tore up the lawn and filling in round the patio where I wanted the plants. We would not give up.
18 hosta |
Sorting the rocks out |
I can’t wait till spring - fingers crossed they all come back.
One last job. Repair the house where the deck was attached. Mike wasn’t to confident he could do it, but I had no doubt.
Replaced the siding |
Power washed it |